A Jiffy Lube location had issues with oil leaving their facility and entering the main city sewer system. Top Choice Plumbing engineered a parallel 1,500 gallon system to be installed outside that worked with their existing system, installed new explosion proof pumps, piping, and redirected storm water into another system designated by the city.
